Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Workshop Shelves Size:M Six years after closure

SKU: 49672928574

4.8
USD100.00 USD125.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 7 - Aug 12

Live Spec

Workshop Shelves Size:M Six years after closureFaint rail tracks run the length of a concrete floor toward a corrugated metal doorway at Awaba Colliery, with tiers of rusted workshop shelving lining the right hand wall. A white cup sits on the floor in the foreground, and scattered industrial debris occupies the lower shelves. Overhead, a crane structure bears the name "Morison Bearby" in bold lettering. Part of the Awaba Colliery series.

Store: armz-ageddon.com · Domain: armz-ageddon.com

Description

Six years after closure

Down the Middle at New South Wales

upper-floor windows empty against the sky

approximately 275 men worked underground at this BHP-owned colliery

Coal production ran from 1930 until December 1962

Workshop Shelves Size:M Six years after closureFaint rail tracks run the length of a concrete floor toward a corrugated metal doorway at Awaba Colliery, with tiers of rusted workshop shelving lining the right hand wall. A white cup sits on the floor in the foreground, and scattered industrial debris occupies the lower shelves. Overhead, a crane structure bears the name "Morison Bearby" in bold lettering. Part of the Awaba Colliery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products